|
|
|
|
LEADER |
00000nam a22000003u 4500 |
001 |
in00004250312 |
003 |
TOE |
005 |
20220616070029.0 |
006 |
m||||||||d|f|||||| |
007 |
cr || |||||||| |
008 |
080801e20020208dcu st f0|| ||eng|d |
035 |
|
|
|a (TOE)823244
|
035 |
|
|
|a OST823244
|
040 |
|
|
|a TOE
|c TOE
|d UtOrBLW
|
049 |
|
|
|a QEMO
|
072 |
|
7 |
|a 29
|
072 |
|
7 |
|a 24
|
088 |
|
|
|a DOE/EIS-0325
|
099 |
|
|
|a E 1.99:DOE/EIS-0325
|
245 |
0 |
0 |
|a Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement.
|
260 |
|
|
|a Washington, D.C :
|b United States., Department of Energy., Office of NEPA Policy and Assistance. ;
|a Oak Ridge, Tenn. :
|b Distributed by the Office of Scientific and Technical Information, U.S. Department of Energy,
|c 2002.
|
300 |
|
|
|a vp.
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
500 |
|
|
|a Published through the Information Bridge: DOE Scientific and Technical Information.
|
500 |
|
|
|c 02/08/2002.
|
500 |
|
|
|a "DOE/EIS-0325"
|
500 |
|
|
|a N/A.
|
500 |
|
|
|a U.S. Department of Energy, Bonneville Power Administration (US)
|
513 |
|
|
|a Topical;.
|
520 |
3 |
|
|a This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.
|
538 |
|
|
|a Available via the World Wide Web.
|
500 |
|
|
|a DOE Technical report ; DOE/EIS-0325
|
500 |
|
|
|a Electronic resource.
|
650 |
|
4 |
|a Bonneville Power Administration.
|
650 |
|
0 |
|a Architecture.
|0 http://id.loc.gov/authorities/subjects/sh85006611
|
650 |
|
4 |
|a Environmental Impact Statements.
|
650 |
|
0 |
|a Electric lines.
|0 http://id.loc.gov/authorities/subjects/sh85041783
|
650 |
|
4 |
|a Us National Environmental Policy Act.
|
650 |
|
4 |
|a Energy Planning, Policy And Economy.
|
650 |
|
4 |
|a Power Transmission And Distribution.
|
653 |
|
|
|a Eis
|a Bpa
|a Hanford
|a Wa
|a Transmission Line
|
710 |
2 |
|
|a United States.
|b , Department of Energy.
|b , Office of NEPA Policy and Assistance.
|b .
|
710 |
1 |
|
|a United States.
|b Department of Energy.
|b Office of Scientific and Technical Information.
|0 http://id.loc.gov/authorities/names/n84003987
|
856 |
4 |
0 |
|u http://www.osti.gov/servlets/purl/823244-uPnZ8v/native/
|z Connect to online resource - All users
|t 0
|
907 |
|
|
|y .b67512537
|b 211127
|c 090506
|
998 |
|
|
|a gd
|a wb
|b 090506
|c m
|d m
|e -
|f eng
|g dcu
|h 0
|i 1
|
982 |
|
|
|a no_backstage
|
999 |
f |
f |
|i fd1cce32-46eb-5393-b541-1e2f5ad7b97c
|s 7ec48e4f-5468-50b6-8d0a-9036290ec700
|t 0
|
952 |
f |
f |
|p Non-Circulating
|a Michigan State University-Library of Michigan
|b Michigan State University
|c MSU Online Resource
|d MSU Government Documents Online Resource
|t 0
|e E 1.99:DOE/EIS-0325
|h Other scheme
|i Electronic Resource
|j Online
|n 1
|
856 |
4 |
0 |
|t 0
|u http://www.osti.gov/servlets/purl/823244-uPnZ8v/native/
|y Connect to online resource - All users
|