Letter from W. W. Corcoran, Esq., Chairman Joint Commission for Completion of Washington Monument, transmitting, in obedience to Law, the Annual Report of Lieut. Col. Thomas L. Casey, U. S. A., Engineer in Charge of the monument, detailing the work done toward the completion of the same during the year ending November 30, 1879, together with statement of moneys expended upon same, and two sheets of tracings, &c.
Corporate Authors: | |
---|---|
Language: | English |
Published: |
Washington :
[publisher not identified],
1879.
|
Subjects: | |
Online Access: | |
Physical Description: | 6 pages : digital, PDF file. |
Variant Title: |
Report on work for completion of Washington Monument. |
Format: | Electronic eBook |
Note: | Includes illustrations. Record is based on bibliographic data in LexisNexis U.S. Serial Set Digital Collection (last viewed Jan. 2007). Reuse except for individual research requires license from LexisNexis Academic & Library Solutions. Electronic resource. |
---|---|
Call Number: | Serial Set Number 1890 S.misdoc.17 |
System Details: | Available via the World Wide Web. |
References: |
LexisNexis U.S. Serial Set Digital Collection. |